Calgary since 2014
The public BBB business record lists an April 2014 start date, names Joey Spurrell as owner, and shows an A+ rating.
BBB lists an April 2014 start, Joey Spurrell as owner, and an A+ rating.
Check the BBB record ↗
Book My Free Site Visit
Calgary deck builders · Since 2014
Need a new deck, or ready to replace the old one? We build decks, install railing, and help you work out what fits your yard and budget. Send us a few details and we’ll arrange a free site visit.
Composite · Cedar · Pressure-treated · Vinyl · Rebuilds · Railings · Pergolas
Start where you are
Compare composite, cedar, pressure-treated and vinyl decking.
Find out what to check before putting new boards on an old frame.
Footings, framing, stairs and the connection to your house.
See what affects the price and what belongs in your quote.
What the free site visit covers
We’ll look at the space, take measurements and talk through materials, stairs, railing and access. If there’s an old deck, we’ll look at that too. Then we can put together a quote for the work you’ve discussed.
Door height, siding, the ledger area, windows, utilities, and where water needs to go.
Height, soil, slope, access, and frost shape the foundation approach for this site—not a default.
Stair direction, landings, gates, and railings are decided with the layout, not after it.
Composite, cedar, pressure-treated, or vinyl—compared on upkeep, budget, sun, and the look you want.
We look for movement, rot and trapped water before deciding what can stay and what needs replacing.
Inclusions, exclusions, permit responsibility, and the decisions still open—so quotes can be compared properly.

Have this ready
None of it needs to be perfect. Rough numbers and phone photos are enough to start a useful conversation.
Before you hire us
Check our business record, ask for our insurance documents, and read the payment and warranty terms before you decide.
The public BBB business record lists an April 2014 start date, names Joey Spurrell as owner, and shows an A+ rating.
BBB lists an April 2014 start, Joey Spurrell as owner, and an A+ rating.
Check the BBB record ↗Business-licence documentation, Commercial General Liability insurance, and WCB-Alberta registration in good standing are available for review.
Licence documents, Commercial General Liability insurance, and WCB good-standing records are available.
The current contract provides a lifetime deck-workmanship warranty for the original client at the original project address, subject to its written terms.
Lifetime deck workmanship for the original client and address, subject to the written contract.
Read the coverage summary ↗When permits are required, the contract assigns the applications, inspections, and required approval path to WBD. Fees are stated in the written scope.
WBD handles required applications and inspection scheduling; fees stay in the written scope.
See the permit process ↗The standard contract uses three visible milestones: deposit, substantial completion, and final completion after the final inspection.
Three stated milestones: acceptance, substantial completion, and final completion after inspection.
See the payment milestones ↗Applicable product credentials and manufacturer terms can be reviewed for the system specified. WBD handles covered manufacturer claims for composite, railing, and vinyl products.
Applicable credentials can be reviewed; WBD handles covered composite, railing, and vinyl claims.
See how product claims work ↗Certificates and applicable manufacturer credentials are available by email. Your signed project documents remain the final word for your specific scope, product system, fees, payment amounts, and coverage.
Footings, framing & connections
The boards are only part of the job. Footings, framing, the connection to the house, stairs and railing all need to be planned together. Here’s a look at that work before the decking goes on.
See how we plan a build ↗
The foundation approach should reflect height, loads, soil, access, and frost—not a default.
How the deck meets the house, flashing, and drainage matter long after the boards look finished.
Joist spacing, beams, blocking, connectors, and corrosion-resistant hardware are the bones of the deck.
Rise, run, guards, posts, and connections are safety details to plan—not improvise at the end.
What we build
Room for the barbecue, better stairs, somewhere to sit—tell us what you need the deck to do.
Less staining, plenty of colour choices, and a consistent finish.
02Real wood grain, natural variation and a regular care plan.
03A practical wood deck when you want to keep material costs down.
04A waterproof walking surface for decks where the space below matters.
05Replace an old deck, change the layout, or find out whether the frame can stay.
06Pergolas, wood privacy walls and supplied-and-installed Sunbelly screens.
Our work
Finished decks, railing and work in progress from WBD projects. Save the details you like and we can talk through them at your site visit.




Railing supply & installation
Need railing for a new deck or want to replace what’s there? We supply the materials and install them. Compare picket, glass and privacy options, then we’ll check the mounting and measurements at your site visit.
Explore railing options ↗“Great work. Honest price/quotes. Attention to detail. Good people to work with.”
Andy Z.Google review excerpt
“Top tier experience with Joey and his crew for my new deck. From the initial quote to demolition to finishing touches…”
ErikGoogle review excerpt
“Joey and his crew did a remarkable job on our deck addition! Communication was great.”
Carly W.Google review excerpt
Before we build
A few questions we hear from homeowners.
Still unsure? Email us ↗Size, materials, railings, stairs, access, demolition, and site conditions all affect price. We start with a site visit, then provide a written scope and quote so you can see exactly what is included. Our cost and planning page explains what moves the number.
Because the useful details—photos, sizes, what is wrong with the old deck—are easier to keep in one written thread than to repeat on a call. You get answers in writing, and the site visit is the conversation that matters.
Some Calgary deck projects do. The City currently requires a building permit for covered decks and for uncovered decks higher than 0.6 m (2 ft) above grade at any point. The exact address and design still need to be checked before construction. Our permits page has the current guide.
Composite is popular for lower routine maintenance. Cedar offers natural warmth. Pressure-treated wood can be a practical value choice. Vinyl suits elevated decks where dry space below matters. The three-question material finder on our decks page gives you a starting point.
The build itself can range from several days to a few weeks depending on size and complexity. Your proposed schedule is part of the written scope, so it is discussed before work starts.
Yes. We serve Calgary and nearby communities including Airdrie, Cochrane, Chestermere, Okotoks, Springbank, and Bearspaw.
Free on-site estimate
A rough size, your community and a few details are enough to start. We’ll reply by email and work out the next step with you.
Serving: Calgary, Airdrie, Cochrane, Chestermere, Okotoks, Springbank, Bearspaw, and nearby communities.